Imagine the power goes out just before the afternoon shift. Staff need the lights and network for four hours, but printing can wait. What should you ask a supplier to keep running? Write down the load before asking for a battery quote.

Start with what has to stay on

Make one row per device: quantity, running watts per unit, and hours needed during the outage. Use measured running power when available. Mark a nameplate rating as an estimate; equipment may draw less in normal use or more for a moment at startup.

Worked example: 100 watts for four hours

In this illustrative office, lighting draws 25 W and the network draws 75 W. The lighting needs 25 W × 4 h = 100 Wh. The network needs 75 W × 4 h = 300 Wh. Together that is 400 Wh, or 0.4 kWh, delivered to the devices. It is not a measured client result.

Now change one assumption: if daylight means the lights only run for two hours, lighting drops to 50 Wh and the total drops to 350 Wh. During the hours both loads run, they still draw 100 W together. Reducing operating time changes the energy requirement without changing that simultaneous load.

Why 400 Wh is not a battery specification

Watts describe power at a moment; watt-hours describe energy over time. The U.S. Energy Information Administration explains the distinction. A battery’s nameplate energy is not the energy delivered to your devices. Usable capacity, conversion losses and the reserve you want to keep all affect runtime.

A separate question is whether the inverter can supply the running and startup loads at the same time. A daily electricity bill cannot answer either question on its own.

What to bring to a site assessment

Bring the load list, typical outage duration, any measurements, and which equipment can wait. Ask the assessor to state the usable capacity, conversion assumptions and peak power behind the proposal. Compare alternatives against the same list. The studio’s essential-load worksheet shows the figures row by row.