Renewable Energy
Which equipment has to stay on when the power goes out? We map how much it draws and for how long, then compare solar, storage and backup options for your site.
Inside the work
What really needs backup power?
Lighting and network equipment draw 100 W together. Each extra hour they run adds another 100 Wh to the backup requirement.
400 Wh at the loads
Before losses and reserve.
| Load | Energy needed |
|---|---|
| Lighting | 25 W × 4 h = 100 Wh |
| Network equipment | 75 W × 4 h = 300 Wh |
This is energy demand, not battery capacity. Check efficiency, usable capacity and reserve; check peak power and starting surges before sizing the inverter.
Deliverables
A power plan with explicit assumptions.
A load profile, a comparison of options, and a list of site checks that could change the recommendation.
- Load and site assessment
- Identify essential and flexible loads, available space, existing supply, and the measurements still needed.
- Solar and hybrid options
- Compare generation, backup duration, and storage assumptions for the site. Flag seasonal limitations and equipment constraints.
- Site-specific generation
- Where wind is being considered, assess local resource data and site constraints before comparing it with solar or a hybrid option.
- Delivery and monitoring brief
- Document what requires local inspection, who confirms equipment selection, and how performance and maintenance will be tracked.
Working together
Bring your outage pattern.
Bring recent bills, your outage pattern, operating hours, and a list of equipment that must keep running.
Build the load profile
Separate essential from deferrable equipment and identify when each load actually runs.
Compare the options
Evaluate backup duration, available space, seasonal supply, maintenance, and budget under the same assumptions.
Plan site verification
Flag what must be measured or inspected locally before equipment selection or installation.
After handover. The proposal sets out who handles site assessment, local approvals, commissioning, and ongoing monitoring.
Before you decide.
Read renewable energy insights- Can we size a system from a bill alone?
- No. Billing totals hide when loads run and which ones overlap. Nameplate ratings are a starting point; operating measurements and peak demand help refine the design.
- Is minimizing cost the same as maximizing backup time?
- Not necessarily. A design for short outages may prioritize essential loads, while a design for bill savings depends on tariffs and when generation coincides with demand. Name the primary goal before comparing options.
Studio guide: How much backup energy does a small office need?