A predictable source of energy is not necessarily a continuous one. At a coastal site, start with the hours the equipment needs power. Then compare that demand with the hours a proposed system could actually generate.
A tide table tells only part of the story
Tidal currents change with the tides. Their timing can be forecast, but a turbine in a tidal stream will produce little power near slack water. A forecast helps an operator plan around that gap; it does not remove it.
Waves answer a different question
Wave devices capture energy from surface motion. Conditions vary with winds, storms and the season. A short survey during rough weather can make a site look more productive than it is across a year. Maintenance crews also need a way to reach the equipment when it needs attention.
Compare the connection as well as the resource
Distance to a grid connection, seabed conditions, marine habitats, permits and access for repairs can change whether a proposal is practical. Electricity generated offshore still has to reach the load.
For a building, start with the load
If a shop needs lights and a router during a four-hour outage, list their running watts and hours before discussing a source. Follow the worked office backup calculation to see why watt-hours at the load are not the same as battery capacity.